Documents Required for Scaffolding Installation

English

Please find below the documents that we need to keep in the exterior scaffold. Scaffolds must be installed within the framework of these documents. It should be kept in mind that the relevant documents are not a recommendation, but are required by law.

 

1. Persons who will install scaffolding should have “Scaffold Installation Person Yeter certificate from Vocational Qualification Authority. A section on the installation of scaffolding in Vocational High Schools has not been opened. Vocational High School Graduation Certificate may also be valid in case of opening.

 

Important Note: If you do not have an employee with a professional qualification certificate, the scaffold must be installed on the employees who have the qualification certificate of the supplier and the installation report should be obtained. Before this process, the qualification documents of the employees to be established should be requested.

 

2. Scaffolding Installation, Use and Disassembly Plan (User Manual) (This must be done by a Civil Engineer, Construction Teacher or Construction Technician) (These documents may be requested from the scaffolding supplier.)

 

3. TSE Certificates of the Pier (These documents may be requested from the scaffolding manufacturer.)

 

4. Periodic inspection reports of up to 6 months (These documents may be requested from the scaffolding manufacturer.)

 

5. Strength and Durability Calculations (Static Accounts) (In case of request and declaration that the configurations with TSE certificate will be used by the Contractor, the account and detail drawings made by the manufacturer can be accepted within the static project, provided that the project author has received the appropriate opinion.) ( These documents may be requested from the scaffolding manufacturer.)